Hotels, campsites and accommodation
HVAC, hot water, envelope, lighting, controls and renewables.
Arrel Energia Pack · Business efficiency grants 2026
Prepare the project before applications open: energy assessment, improvement options, technical evidence, application and final justification.
Early preparation
We review consumption, buildings, systems and objectives early to identify realistic, measurable improvements.
The announced tertiary-building programme targets at least a 20% reduction in consumption. We prepare comparable scenarios and an evidence plan that can be adapted to the final rules.
Phased service
Who it is for
HVAC, hot water, envelope, lighting, controls and renewables.
Equipment, commercial refrigeration, HVAC, lighting and energy management.
Comfort, thermal systems and consumption reduction.
Processes, motors, compressed air, heating, cooling, recovery and management.
How we proceed
We collect activity, location, use, area, systems and proposed improvements.
We identify measures and evidence without assuming unpublished eligibility.
Once published, we align calculations, reports and forms with the final rules.
We organise records and document investment and energy savings.
ICAEN · 2026
Beneficiaries, eligible measures, grant rates, deadlines and mandatory evidence cannot be confirmed until the official rules and call are published.
Informació oficial de l’ICAENFrequently asked questions
Not yet. ICAEN has announced both programmes; we will verify the official status before any application work starts.
Programmes have been announced for industry and tertiary-sector buildings. The final rules will define beneficiaries.
It is the minimum target announced for tertiary buildings; the calculation method will be set by the call.
That will depend on the project and final rules. We can prepare an EPC or assessment and coordinate an audit where required.
Yes: collect consumption data, assess equipment, define measures and request quotations. Irreversible decisions should wait for the final conditions.
Site visits focus on Camp de Tarragona; application and document support is available across Catalonia.
Tell me about the activity, location, consumption and proposed improvements for an initial assessment.